Twelve sectors, from listed heritage fabric to a copper recycling plant. Every project here is a completed appointment on our own job register, written up with the stages we delivered, the software we designed in and the engineers who did it.
Industrial5 projects



Process plant facility
Kent
ADR was appointed by Halsion to complete RIBA Stages 4 to 6 for a large process plant facility in Kent. The £40m+ plant recovers copper and precious metals from scrapped electrical goods at a rate of 25,000 tonnes a year and opened in October 2025. The team developed the project using industry software Revit, ElectricalOM and Dialux.
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
| Services designed | Mechanical and electrical |
|---|---|
| Client / project team | Halsion |
| Designed in | RevitElectricalOMDialux |
| ADR team | Josh ButcherJim Rose |



Bulk250, Unit 1
West Thurrock, Essex
ADR was appointed by Kestrel Electrics and Oakland Mechanical to complete RIBA Stages 2 to 6 for Unit 1 at Bulk250, West Thurrock, delivered by Faircloth Construction. The £6.3m refurbishment of the 250,000 sq ft unit stripped out the gas-fired services and replaced them with air source heat pumps, high-efficiency heating and cooling, LED lighting and a 200kWp rooftop solar array, alongside extensive EV charging, completing in Q4 2024. The team developed the project using industry software AutoCAD, ElectricalOM, Matterport and Dialux.
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
| Services designed | Mechanical and electrical |
|---|---|
| Client / project team | Kestrel Electrics · Oakland Mechanical |
| Designed in | AutoCADElectricalOMMatterportDialux |
| ADR team | Lex RouzeeLucy Babins |

Cartersfield Road / D25
Waltham Abbey, Essex
Design and build duties for the MEP services, developing Stage 3 information through to Stage 6 construction record. BREEAM Very Good, EPC A+, Net Zero Carbon and Secured by Design, with roof-mounted PV generation.
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
| Project value | £4.9m |
|---|---|
| Services designed | Mechanical, electrical and public health |
| Client / project team | Kestrel Electrics · TSG Electrical Services |
| Designed in | RevitAutoCADDesign BuilderElectricalOMDIALux evo |
| ADR team | Lex RouzeeStephen SparshottLucy Babins |


Park Royal 1
Abbey Road, Park Royal, London
ADR took the existing Stage 3 MEP design and developed the Stage 4–6 information for the MEP contractors, hosted on Trimble Connect so site teams could work from the 3D model on tablets.
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
| Project value | £10m |
|---|---|
| Services designed | Mechanical, electrical and public health |
| Client / project team | Kestrel Electrics · Faircloth · Oakland Mechanical |
| Designed in | RevitTrimble ConnectDesign BuilderElectricalOMH2xDIALux evo |
| ADR team | Lex RouzeeNat GoddenDon FosterJasper SimmondsJim Rose |



Park Royal 2
Park Royal, London
Full development of the mechanical, electrical and public health services, modelled in Revit so architectural, structural and MEP were fully coordinated before works started on site.
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
| Services designed | Mechanical, electrical and public health |
|---|---|
| Client / project team | Kestrel Electrics · Oakland Mechanical |
| Designed in | RevitAutoCADTrimble Connect |
Offices4 projectsNew sector



Invicta House
Sessions House Square, Maidstone
ADR was appointed by WW Martin Ltd to complete RIBA Stages 2 to 4 for Invicta House, Kent County Council’s headquarters at Sessions House Square, Maidstone. The building is a six-storey office arranged around a covered central atrium of roughly 86,000 sq ft, refurbished as part of the wider Maidstone East civic campus. The team developed the project using industry software Revit, H2x, DesignBuilder, ElectricalOM and Dialux.
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
| Services designed | Mechanical and electrical |
|---|---|
| Client / project team | WW Martin Ltd |
| Designed in | RevitH2xDesignBuilderElectricalOMDialux |
| ADR team | Lex RouzeeNat GoddenStephen SparshottJasper SimmondsJosh ButcherChris Field |


Cardinal West
Cardinal Park, Godmanchester
ADR was appointed by TSG Electrical Services to complete RIBA Stages 2 to 6 for Cardinal West, Units 2 and 3 Cardinal Park, Godmanchester, Huntingdon. The 57,100 sq ft detached warehouse and industrial unit has a 9.4m clear internal height and is undergoing extensive refurbishment to provide seven electrically operated loading doors, a self-contained yard and two-storey office accommodation. The team developed the project using industry software AutoCAD, H2x, DesignBuilder and Matterport.
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
| Services designed | Mechanical and electrical |
|---|---|
| Client / project team | TSG Electrical Services |
| Designed in | AutoCADH2xDesignBuilderMatterport |
| ADR team | Lex RouzeeLucy BabinsStephen Sparshott |

REWD Box Thanet
Margate, Kent
ADR was appointed by Kentish Projects to complete RIBA Stages 2 and 3 for REWD Box Thanet, a £3m single and double storey shipping container development on greenfield land outside Margate, Kent. The scheme mixes boutique start-ups, cafes, workspace, a gym and local amenities around communal roof terraces overlooking the Kent coastline, with photovoltaic arrays to every flat roof and all new buried power, telecoms, data and water services. The team developed the project using industry software AutoCAD, ElectricalOM and Dialux.
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
| Services designed | Mechanical and electrical |
|---|---|
| Client / project team | Kentish Projects |
| Designed in | AutoCADElectricalOMDialux |
| ADR team | Lex RouzeeLucy Babins |

Sessions House
Sessions House Square, Maidstone
ADR was appointed by WW Martin Ltd to complete RIBA Stages 1 and 2 for Sessions House, Maidstone, part of Kent County Council’s civic campus at Sessions House Square. ADR produced the M&E Reconfiguration Feasibility Report setting out the options for reconfiguring the building’s mechanical and electrical services. The team developed the project using industry software Matterport.
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
| Services designed | Mechanical and electrical feasibility |
|---|---|
| Client / project team | WW Martin Ltd |
| Designed in | Matterport |
| ADR team | Lex RouzeeJasper Simmonds |
Care & supported living2 projects · 1 placeholderNew sector


RBLI Centenary Village, Phase 2B
Aylesford, Kent
ADR was appointed by Grummant Heating & Plumbing and Joint Electrical to complete RIBA Stages 2 to 6 for Phase 2B of the Royal British Legion Industries Centenary Village at Aylesford, Kent. The £28m village will deliver 100 homes for 100 veterans by 2027, combining emergency accommodation, family homes, supported living and adapted apartments around a central community hub. The team developed the project using industry software AutoCAD, ElectricalOM and Dialux.
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
| Services designed | Mechanical and electrical |
|---|---|
| Client / project team | Grummant Heating & Plumbing · Joint Electrical |
| Designed in | AutoCADElectricalOMDialux |
| ADR team | Lex RouzeeLucy Babins |

Barchester care home
Kent
ADR was appointed by HOB Mechanical to complete RIBA Stages 4 to 6 for a Barchester care home in Kent, providing mechanical support through construction. The team developed the project using industry software H2x and AutoCAD.
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
| Services designed | Mechanical |
|---|---|
| Client / project team | HOB Mechanical |
| Designed in | H2xAutoCAD |
| ADR team | Nat GoddenJasper Simmonds |
Before this can go live
- ●Photography or a Revit model export
- ●What ADR did — the narrative
- ●Stages, software and team
- ●Client consent
Russell House
Kent
Parked for this release. The appointment is on record; the write-up has not been started.
| Client / project team | Joint Electrical |
|---|
Healthcare2 projectsNew sector

The Maples Health Centre
Broxbourne, Hertfordshire
ADR was appointed by SJS Technical Services to complete RIBA Stages 2 to 6 for The Maples Health Centre, Vancouver Road, Broxbourne, Hertfordshire. The six-GP practice of roughly 846 sq m sits over a basement car park on a constrained 0.2-acre site, delivered under a S.106 agreement for the adjacent Canada Fields development. The team developed the project using industry software AutoCAD, H2x, DesignBuilder and ElectricalOM.
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
| Services designed | Mechanical, electrical and public health |
|---|---|
| Client / project team | SJS Technical Services |
| Designed in | AutoCADH2xDesignBuilderElectricalOM |
| ADR team | Scott CalverGlenStephen Sparshott |

Hospice in the Weald
Pembury, Kent
ADR was appointed by HOB Mechanical to complete RIBA Stages 5 and 6 for Hospice in the Weald at Pembury, Kent, with Baxall Construction as main contractor. The hospice is an independent charity providing end-of-life care across West Kent and northern East Sussex. The team developed the project using industry software AutoCAD and H2x.
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
| Services designed | Mechanical |
|---|---|
| Client / project team | HOB Mechanical |
| Designed in | AutoCADH2x |
| ADR team | Nat GoddenJasper Simmonds |
Rail & stations2 projects · 2 placeholderNew sector
RAI-01↗Harlow Mill stationOld Harlow, EssexGRIP G4–G5
RAI-02↗TfL staff welfare, Phase 2London — five locationsGRIP G3–G5RAI-03Rail & stationsPlaceholder · awaiting imageryColchester station car parkColchester, EssexPlaceholderRAI-04Rail & stationsPlaceholder · awaiting imageryThetford station buildingThetford, NorfolkPlaceholder


Harlow Mill station
Old Harlow, Essex
ADR was appointed by MA Designs to complete Network Rail GRIP Stages 4 and 5 for Harlow Mill station, Old Harlow, Essex. Greater Anglia’s upgrade added an enclosed waiting room on the London-bound platform with LED lighting, seating and a workstation with charging points served by a new heating and cooling system, along with the station’s first LED lighting to the 34-space car park and a secure 12-space cycle store. The team developed the project using industry software Dialux, AutoCAD and ElectricalOM.
- G1
- G2
- G3
- G4
- G5
- G6
- G7
- G8
| Services designed | Mechanical and electrical |
|---|---|
| Client / project team | MA Designs |
| Designed in | DialuxAutoCADElectricalOM |
| ADR team | Lex RouzeeLucy BabinsStephen Sparshott |


TfL staff welfare, Phase 2
London — five locations
ADR was appointed by MA Designs to complete Network Rail GRIP Stages 3 to 5 for Transport for London’s Phase 2 staff welfare upgrades. The programme covered toilets, shower cubicles and kitchens across five locations — Acton Town, Camden Town, Embankment, Greenwich Power Station and Leicester Square — with ADR selecting products against a generic specification.
- G1
- G2
- G3
- G4
- G5
- G6
- G7
- G8
| Services designed | Mechanical and electrical |
|---|---|
| Client / project team | MA Designs |
| Designed in | AutoCADElectricalOMDialux |
| ADR team | Lex RouzeeLucy BabinsStephen Sparshott |
Before this can go live
- ●Photography or a Revit model export
- ●What ADR did — the narrative
- ●Stages, software and team
- ●Client consent
Colchester station car park
Colchester, Essex
Parked for this release. The register also holds a decked car park renewal and a Colchester LMD appointment — three appointments in one location would make a stronger single write-up than three thin ones.
| Client / project team | Haydn Evans |
|---|
Before this can go live
- ●Photography or a Revit model export
- ●What ADR did — the narrative
- ●Stages, software and team
- ●Client consent
Thetford station building
Thetford, Norfolk
Parked for this release. Useful evidence of reach into Norfolk for BS3 Suffolk when it is written up.
| Client / project team | Haydn Evans |
|---|
Public sector1 project · 1 placeholderNew sector

Canterbury City Council offices
Canterbury, Kent
ADR was appointed by Primech to complete RIBA Stages 4 to 6 for Canterbury City Council’s offices. The council relocated from its Military Road headquarters into refurbished accommodation at Rose Lane and within the Whitefriars centre, completing in early 2024. The team developed the project using industry software Revit, H2x, DesignBuilder, ElectricalOM and Dialux.
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
| Services designed | Mechanical and electrical |
|---|---|
| Client / project team | Primech |
| Designed in | RevitH2xDesignBuilderElectricalOMDialux |
| ADR team | Don FosterNat GoddenJasper SimmondsJosh ButcherJim Rose |
Before this can go live
- ●Confirmation that anything can be published at all
- ●What ADR did — the narrative
- ●Stages, software and team
HMP Elmley
Isle of Sheppey, Kent
Parked for this release. Secure estate — assume it cannot be published in detail. It may still be usable as a named sector credential without project specifics.
| Client / project team | HOB Mechanical |
|---|
High-rise residential2 projectsNew sector

Premier Place
Station Road, Edgware, London
ADR was appointed by Harrisons Electrical Services to complete RIBA Stages 4 and 5 for Premier Place, Station Road, Edgware, London. The scheme delivers 124 residential units with associated commercial space for Sovereign Network Group across a mix of shared ownership and social rent tenures, built by Stack London. ADR provided mechanical and electrical peer review and coordination for the MEP contractor following the restart of the project. The team developed the project using industry software AutoCAD, ElectricalOM and H2x.
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
| Services designed | Mechanical and electrical peer review and coordination |
|---|---|
| Client / project team | Harrisons Electrical Services |
| Designed in | AutoCADElectricalOMH2x |
| ADR team | Nat GoddenJasper SimmondsLex RouzeeLucy Babins |

The Grove
Gravesend, Kent
ADR was appointed by Hollaway Studios to complete RIBA Stages 2 and 3 for The Grove, Gravesend, Kent. The scheme converts a former JobCentre into 37 apartments — 31 studios and six one-bedroom flats — within an existing T-shaped building, retaining 22 parking spaces and adding 41 cycle spaces. The team developed the project using industry software AutoCAD and Dialux.
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
| Services designed | Mechanical and electrical |
|---|---|
| Client / project team | Hollaway Studios |
| Designed in | AutoCADDialux |
| ADR team | James MaylandStephen SparshottMark Keenan |
Education5 projects


Walmer School
Walmer, Kent
ADR was appointed by Amdell to complete RIBA Stages 4 to 6 for Walmer School, Kent. The £20m SEND expansion for Kent County Council was delivered over three phases on Salisbury Road, eventually taking up to 240 pupils, with therapy spaces, a sports hall and a MUGA. The team developed the project using industry software Revit, H2x and DesignBuilder.
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
| Services designed | Mechanical and electrical |
|---|---|
| Client / project team | Amdell |
| Designed in | RevitH2xDesignBuilder |
| ADR team | Chris FieldJim Rose |


Dover Technical College
Dover, Kent
ADR was appointed by Woodley Coles to complete RIBA Stages 2 to 4 for the first phase of the new Workshop Building at Dover Technical College, part of the EKC Group estate. ADR supported the workshop redevelopment from concept to completion, applying a Be Lean, Be Green approach across every element of the building services design and targeting a BREEAM Very Good rating. The team developed the project using industry software Dialux, AutoCAD and ElectricalOM.
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
| Services designed | Mechanical and electrical |
|---|---|
| Client / project team | Woodley Coles |
| Designed in | DialuxAutoCADElectricalOM |
| ADR team | Lex RouzeeLucy BabinsStephen Sparshott |

Hundred of Hoo Academy
Hoo St Werburgh, Medway
ADR was appointed by Primech to complete RIBA Stages 5 and 6 for the new teaching block at Hundred of Hoo Academy, Hoo St Werburgh, Medway. The steel-framed block was built inside a fully operational school, with the works segregated from pupils and the programme driven by term dates. The team developed the project using industry software Revit, H2x, DesignBuilder and ElectricalOM.
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
| Services designed | Mechanical and electrical |
|---|---|
| Client / project team | Primech |
| Designed in | RevitH2xDesignBuilderElectricalOM |
| ADR team | Don FosterNat GoddenJasper SimmondsJosh ButcherJim Rose |


Whitfield Aspen School
Whitfield, Kent
New two-storey extensions for 8 classrooms and 4 group rooms. Heating and comfort cooling is delivered through natural ventilation and heat recovery units, with Kronoterm air source heat pumps generating heat in the colder months and changing over to supply cooling in summer.
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
| Services designed | Mechanical and electrical |
|---|---|
| Client / project team | WW Martin Ltd · Eco MEP |
| Designed in | RevitAutoCADDesign BuilderElectricalOM |
| ADR team | Lex RouzeeJosh ButcherJasper Simmonds |


Cawthorne Lecture Theatre
Tonbridge School
Conversion of a former school chapel, latterly a lecture theatre, into a staff room facility. ADR developed the original design team’s Stage 3 proposals into a fully coordinated 3D Revit model with the associated calculation packages. The age of the building and the restricted service routes drove the coordination effort.
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
| Services designed | Electrical only |
|---|---|
| Client / project team | Gilbert & Stamper · Baxall Construction |
| Designed in | Revit |
| ADR team | Don FosterJim Rose |
Residential6 projects
RES-01↗Boundary Road, Old Gas WorksRamsgate, KentStages 3–6
RES-02↗Mill ViewAshford, KentStages 2–6
RES-03↗HeathsideAppledore, Ashford, KentStages 2–6
RES-04↗Oakleigh HouseAshford, KentStages TBC
RES-05Imagery withheldRestricted · client confidentialityPrivate residence, FranceFranceStages 5
RES-06Imagery withheldRestricted · client confidentialityPrivate residence, central LondonLondonStages 5

Boundary Road, Old Gas Works
Ramsgate, Kent
ADR was appointed by Blueberry Developments Estates to complete RIBA Stages 3 to 6 for the former Old Gas Works site at Boundary Road, Ramsgate, Kent. The scheme delivers 73 apartments across three new four-storey blocks and the conversion of the Grade II listed former gas works offices, a building that had fallen into an advanced state of decay before restoration. The team developed the project using industry software AutoCAD, Revit, ElectricalOM, Dialux, H2x and DesignBuilder.
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
| Services designed | Mechanical, electrical and public health |
|---|---|
| Client / project team | Blueberry Developments Estates |
| Designed in | AutoCADRevitElectricalOMDialuxH2xDesignBuilder |
| ADR team | Lex RouzeeLucy BabinsJasper SimmondsNat GoddenJim Rose |

Mill View
Ashford, Kent
Small residential scheme of four semi-detached houses using ASHPs linked to underfloor heating, roof-mounted PV and EV charging to each property. The site replaces houses destroyed by a gas explosion.
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
| Services designed | Mechanical, electrical and public health |
|---|---|
| Client / project team | Jenner Contractors for Ashford Borough Council |
| Designed in | Revit (BIM with COBie outputs)AutoCAD |
| ADR team | Don FosterNat GoddenJim Rose |

Heathside
Appledore, Ashford, Kent
Four properties arranged as ground and first floor flats, using ASHPs linked to underfloor heating and roof-mounted PV arrays, with EV charging for every flat drawing on the power generated by the panels.
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
| Services designed | Mechanical, electrical and public health |
|---|---|
| Client / project team | Jenner Contractors for Ashford Borough Council |
| Designed in | Revit (BIM with COBie outputs)AutoCAD |
| ADR team | Don FosterNat GoddenJim Rose |

Oakleigh House
Ashford, Kent
54 independent living apartments for older residents, plus 5 apartments for adults with learning difficulties.
| Client / project team | Jenner Contractors for Ashford Borough Council |
|---|---|
| Designed in | AutoCAD |
| ADR team | Don Foster |
Imagery withheld under client confidentialityPrivate residence, France
France
RIBA Stage 5 delivery — full Revit models and detailed installation drawings for a private residence outside the UK, produced alongside several other consultants.
Client confidentiality. No name, no address, no value. The imagery is retained but deliberately destroyed — enough to show there is a real building behind the tile, not enough to identify it.
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
| Services designed | Mechanical, electrical and public health |
|---|---|
| Client / project team | Withheld under NDA |
| Designed in | RevitAutoCAD |
Imagery withheld under client confidentialityPrivate residence, central London
London
RIBA Stage 5 delivery — a full Revit model, detailed installation drawings and site-level coordination across the wet, air and specialist systems.
Client confidentiality. The systems list is generic enough to describe the capability without identifying the property.
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
| Services designed | Spa and plunge pool · air handling · cooling · humidification · sauna and steam |
|---|---|
| Client / project team | Withheld under NDA |
| Designed in | RevitAutoCAD |
Commercial5 projects
COM-01↗43 Suez RoadEnfield, LondonStages 2–6
COM-02↗Springwood keyworker housingSpringwood Road, MaidstoneStages 4–6
COM-03↗Mile End Stadium plant roomMile End, LondonStages 3–6
COM-04↗Sisk welfare facilityWembley Park, LondonStages 4–5 · £300–400k
COM-05↗Dover Discovery CentreDover, KentStages 5 · £1.1–1.3m
43 Suez Road
Enfield, London
ADR was appointed by Kestrel Electrics and Oakland Mechanical to complete RIBA Stages 2 to 6 for 43 Suez Road, Enfield, delivered by Faircloth Construction. The £8.1m brownfield redevelopment created a 74,830 sq ft urban logistics and warehouse unit with optional multi-storey mezzanine storage, designed to achieve BREEAM Excellent and a Zero Carbon rating. The team developed the project using industry software AutoCAD, ElectricalOM, H2x, DesignBuilder and Dialux.
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
| Services designed | Mechanical, electrical and public health |
|---|---|
| Client / project team | Kestrel Electrics · Oakland Mechanical |
| Designed in | AutoCADElectricalOMH2xDesignBuilderDialux |
| ADR team | Lex RouzeeLucy BabinsChris FieldJosh ButcherJim Rose |

Springwood keyworker housing
Springwood Road, Maidstone
ADR was appointed by Joint Electrical to complete RIBA Stages 4 to 6 for the Springwood development at Springwood Road, Maidstone, delivered by Jenner. The scheme provides 160 keyworker apartments across two blocks for staff at the neighbouring Maidstone Hospital. The team developed the project using industry software AutoCAD, ElectricalOM and Dialux.
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
| Services designed | Mechanical and electrical |
|---|---|
| Client / project team | Joint Electrical |
| Designed in | AutoCADElectricalOMDialux |
| ADR team | Lex RouzeeLucy Babins |

Mile End Stadium plant room
Mile End, London
ADR was appointed by Tower Hamlets Borough Council to complete RIBA Stages 3 to 6 for the plant room refurbishment at Mile End Stadium, London. ADR provided the mechanical design and coordination for the borough’s plant room replacement. The team developed the project using industry software AutoCAD.
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
| Services designed | Mechanical |
|---|---|
| Client / project team | Tower Hamlets Borough Council |
| Designed in | AutoCAD |
| ADR team | Lex RouzeeLucy BabinsStephen Sparshott |



Sisk welfare facility
Wembley Park, London
BSRIA Stage 4 and 5 designs for a 4,500m² welfare facility. Detailed thermal modelling and multiple annual simulations predicted heating and cooling profiles and annual operating energy, which drove the most efficient energy plant solution.
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
| Project value | £300–400k |
|---|---|
| Services designed | Mechanical and electrical |
| Client / project team | Solaris Energy · John Sisk · Quintain |
| Designed in | Revit |
| ADR team | Nat GoddenJasper SimmondsJim Rose |



Dover Discovery Centre
Dover, Kent
Full renovation of the existing Discovery Centre — new central air handling, VRF, domestic services and drainage, with full Revit modelling, pressure drop calculations and thermal calculations. All calculation outputs were issued to the client and contractor team so design selections could be interrogated openly.
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
| Project value | £1.1–1.3m |
|---|---|
| Services designed | Air handling · VRF · domestic services · drainage |
| Client / project team | Amdell · Jager Electrical · Walker Construction |
| Designed in | RevitAutoCADDesign Builder |
| ADR team | Nat GoddenJasper SimmondsJim Rose |
Historical3 projects



Commissioners House
Chatham Dockyard, Kent
Replacement of the existing gas fired heating system with a bivalent heat pump and gas system, plus new domestic hot water systems, ventilation and drainage. High temperature R290 heat pumps run in a bivalent arrangement with the retained gas plant.
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
| Project value | £300–400k |
|---|---|
| Services designed | Heating · domestic hot water · ventilation · drainage |
| Client / project team | Amdell |
| Designed in | RevitDesign Builder |
| ADR team | Nat GoddenJasper SimmondsJim Rose |


Lympne Castle
Lympne, Kent
Replacement of the existing oil central boiler system with an air source heat pump system serving a mixture of new and existing radiators, plus a new domestic services system and associated drainage.
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
| Project value | £300–400k |
|---|---|
| Services designed | Heating · domestic services · drainage |
| Client / project team | Amdell |
| Designed in | RevitAutoCADDesign Builder |
| ADR team | Jasper SimmondsChris Field |



Ightham Mote Visitor Centre
Sevenoaks, Kent
Mechanical design for a new National Trust visitor reception building and retail shop, using air source heat pumps, surface water management and a green roof — a fully sustainable building inside the walled garden of a Grade I listed medieval moated manor house.
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
| Services designed | Mechanical |
|---|---|
| Client / project team | National Trust · Amdell · WW Martin |
| Designed in | RevitAutoCAD |
| ADR team | Nat GoddenJasper Simmonds |
Retail & automotive3 projects

BMW Ruxley
Ruxley, Kent
ADR was appointed by Gilbert & Stamper to complete RIBA Stages 3 to 6 for the BMW dealership at Ruxley, delivered by Horizon Construction. ADR provided infrastructure coordination for the utility service upgrades and diversions, and designed the EV charging network for the site. The team developed the project using industry software AutoCAD, ElectricalOM and Dialux.
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
| Services designed | Infrastructure coordination · EV charging design |
|---|---|
| Client / project team | Gilbert & Stamper |
| Designed in | AutoCADElectricalOMDialux |
| ADR team | Don FosterJim Rose |

Clarins, Ashford Designer Outlet
Ashford, Kent
ADR was appointed by AW Construction Services to complete RIBA Stages 2 and 3 for the Clarins unit at Ashford Designer Outlet, Kent. ADR developed the client floor plan, the wall and ceiling detailing, and the fixed furniture and equipment layouts. The team developed the project using industry software AutoCAD.
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
| Services designed | Floor plans · wall and ceiling detail · FF&E layouts |
|---|---|
| Client / project team | AW Construction Services |
| Designed in | AutoCAD |
| ADR team | Lucy Babins |

Audi PDI Prep Centre
Kingsnorth, Kent
Conversion of an existing warehouse into an Audi PDI prep centre where new vehicles are inspected and cleaned before delivery to sales centres. ADR developed the original design team’s Stage 3 proposals into a fully coordinated Stage 4–6 2D design, with multiple service ramps and electric vehicle charging in a fully equipped maintenance workshop.
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
| Services designed | Electrical only |
|---|---|
| Client / project team | Gilbert & Stamper · Craven Construction · ISN Europe |
| Designed in | AutoCAD |
| ADR team | Don FosterJim Rose |
Mixed use & car parks2 projectsNew sector

5 York Street
Broadstairs, Kent
ADR was appointed by Buckingham Mews Limited to complete RIBA Stages 2 and 3 for 5 York Street and 6-8 Buckingham Road, Broadstairs, Kent. The conversion-led scheme brings a group of historic town centre buildings back into use as a seven-bed boutique hotel, five self-contained holiday cottages, commercial floorspace and three homes, with on-site parking and EV charging. The team developed the project using industry software AutoCAD and ElectricalOM.
- 0
- 1
- 2
- 3
- 4
- 5
- 6
- 7
| Services designed | Mechanical and electrical |
|---|---|
| Client / project team | Buckingham Mews Limited |
| Designed in | AutoCADElectricalOM |
| ADR team | Lex RouzeeLucy Babins |

Audley End station car park
Wendens Ambo, Essex
ADR was appointed by MA Designs to complete Network Rail GRIP Stages 4 and 5 for the car park upgrade at Audley End railway station, Wendens Ambo, Essex. Greater Anglia’s scheme installed new lighting throughout the 580-space car park, added three electric vehicle charging points and created 26 additional blue badge bays near the station entrance, with the car park remaining open throughout the nine-week programme. The team developed the project using industry software Dialux, AutoCAD and ElectricalOM.
- G1
- G2
- G3
- G4
- G5
- G6
- G7
- G8
| Services designed | Electrical |
|---|---|
| Client / project team | MA Designs |
| Designed in | DialuxAutoCADElectricalOM |
| ADR team | Lex RouzeeLucy Babins |