ADR Consulting Engineers were appointed to convert an existing warehouse building into a Audi PDI Prep Centre where new vehicles are inspected and cleaned prior to delivery to Audi sales centres. This provided a fully equipped maintenance workshop with multiple service ramps and electric vehicle charging facilities. ADR Consulting Engineers developed the original design teams Stage 3 proposals and provided a fully coordinated Stage 4-6 2D design by working closely with the mechanical design team and the garage equipment supply company ISN Europe. This was an electrical only project working for Gilbert & Stamper Electrical with Craven Construction as the main contractor.
Project Name
Audi PDI Prep Centre
Project Stages
Stages 4-6

Design Software
- CAD
Team Members
- Don Foster
- Jim Rose