This contract saw ADR deliver the mechanical design for a new National Trust visitor reception building and retail shop at Ightham Mote near Sevenoaks, Kent. Great to be working with the National Trust, Amdell Ltd and WW Martin Ltd. The building is fully sustainable using air source heat pumps, surface water management and a greenContinueContinue reading “Ightham Mote”
Tag Archives: coordination
Cawthorne Lecture Theatre
ADR Consulting Engineers were appointed to convert of a former school chapel previously used as a lecture theatre into a staff room facility. ADR Consulting Engineers developed the original design teams Stage 3 proposals and provided a fully coordinated 3D Revit model and associated calculation packages. A challenging project due to the age of theContinueContinue reading “Cawthorne Lecture Theatre”
High-end residential renovation, London.
ADR Consulting Engineers have been appointed by Halsion Ltd, to provide a full Revit model and detailed installation drawings (RIBA Stage 5) for a high-end residential renovation in London. Design and detailed site level coordination has been provided for the following: -Chilled plunge pool and spa. -Air handling systems. -Cooling systems. -Humidification. -Screening rooms. -Sauna,ContinueContinue reading “High-end residential renovation, London.”
Park Royal 2
ADR Consulting Engineers have successfully completed the development of Mechanical, Electrical, and Public Health services for both PR1 and PR2 at Park Royal, London. ADR Consulting Engineers Ltd were appointed to develop the Mechanical, Electrical, and Public Health for both PR1 and PR2 at Park Royal, London. Both projects were developed utilising Revit to ensureContinueContinue reading “Park Royal 2”
Commissioners House, Chatham
ADR Consulting Engineers were appointed on Commissioners House to replace existing gas fired heating system for a new bivalent heat pump and gas system using high temperature R290 heat pumps, new domestic hot water systems, ventilation, and drainage. Project & Client Commissioners House Amdell Ltd Project Value £300-400k Project Stages Stages 4,5, & 6 DesignContinueContinue reading “Commissioners House, Chatham”
Dover Discovery Centre
ADR Consulting Engineers were appointed to provide full renovation of existing discovery centre site, working with our long term client Amdell Ltd, Jager Electrical and Walker Construction. Services included new central air handling systems, VRF, domestic services and drainage systems. Full Revit modelling, air pressure drop calculations, thermal calculations and domestic service design. All calculationContinueContinue reading “Dover Discovery Centre”
Park Royal 1
ADR Consulting Engineers were appointed to take the existing stage 3 MEP design and develop the stage 4-6 design stage information for the MEP contractors. Project Name Park Royal 1 Project Value £10,000,00.00 Project Stages Stages 4-6 Project Highlights Utilising Revit and Trimble Connect to deliver accurate design information from digital to the built environmentContinueContinue reading “Park Royal 1”
New Space for a New Team, Same Incredible Service.
We are excited to share with you some images of our new workspace at Denne Hill. New Space for a New Team, same incredible service.
Stunning Office Space for us at Denne Hill
After nearly 3 years and 3 office moves, it is time for another! We are excited to announce we are moving into stunning office space at Denne Hill.
Stage 7 – In Use, the Start of the Buildings Life Cycle
RIBA Stage 7 – In Use is where we complete the design series. This marks the end of the RIBA stages and the building entering its “In Use” phase.
You must be logged in to post a comment.