ADR Consulting Engineers have been appointed by Halsion Ltd, to provide a full Revit model and detailed installation drawings (RIBA Stage 5) for a high-end residential renovation in London. Design and detailed site level coordination has been provided for the following:
-Chilled plunge pool and spa.
-Air handling systems.
-Cooling systems.
-Humidification.
-Screening rooms.
-Sauna, steam rooms.
Project Name
High-end residential renovation, London. Halsion Ltd
Project Value
MEP value £2-4m
Project Stages
RIBA Stage 5

Project Highlights
- Multiple consultant collaboration
Design Software
- Revit
- CAD
Team Members
- Nat Godden
- Josh Butcher
Do you have a project coming up?
Why not get in touch with our team today to discuss? We offer free and confidential advice and are happy to support projects of all sizes.
You must be logged in to post a comment.