We are very excited to officially welcome Chris to the ADR team. Don, Jim and Chris have worked on some exciting projects together in the past. Chris is joining us as a senior mechanical engineer and brings with him a wealth of experience and knowledge. Read more in the link …
Category Archives: Design
The ADR team are proud to welcome Scott and Josh B.
We are very excited to officially welcome Scott and Josh B to the ADR team. Scott, Don, James and Lex have worked together in the past. Jasper and Josh have been collaborating at London South Bank University for a few years now.
Both Scott and Josh B. are driven, passionate engineers with an eye for detail and come from contracting backgrounds. We are thrilled to have them with us.
Christmas round-up from the ADR team.
2023 has been a truly amazing year! So we wanted to share with you a Christmas round-up from the ADR Team. Our journey this year has seen us move offices,
We are proud to welcome Jim to the Team
We are so very excited to officially welcome Jim to the ADR team as our new REVIT/CAD Manager. His appointment brings full in-house Revit capability to ADR Consulting Engineers Ltd and allows us to grow further as a MEP Consultancy.
We are proud to welcome Jasper to the Team
We are very excited to officially welcome Jasper to the team. At ADR we believe in passing our knowledge and experience onto young engineers, instilling our approach to the design of construction projects and collaboration. As Jasper continues his career with us, we look forward to adding him to our vibrant and energetic team.
Stage 7 – In Use, the Start of the Buildings Life Cycle
RIBA Stage 7 – In Use is where we complete the design series. This marks the end of the RIBA stages and the building entering its “In Use” phase.
We are proud to welcome Nat and Don to the Team
The time is finally here to officially welcome Nat and Don to the team. This has been a little while in the making, and I am so very proud to be announcing this today
Stage 6 – Handover and Close Out
Stage 6 – Handover and Close Out signals the final part of the construction stage. It is the final flurry of activity before the building enters its “In Use” stage. A reminder that you can catch up on the previous posts here. Most projects will observe a handover called “Practical Completion”. This stage can beContinueContinue reading “Stage 6 – Handover and Close Out”
Stage 5 – Construction and Building out the Design
After a long gap in the series, today we are looking at Stage 5 – Construction and building out the design. Hopefully, you are following the series? if not, you can catch up on the previous posts here. If Stage 4 has been completed to the LoD defined in the BSRIA Guide, then developing theContinueContinue reading “Stage 5 – Construction and Building out the Design”
Stage 4 – Technical Design, the final step before Construction
Today we are looking at Stage 4 – Technical Design, the final step before Construction. Hopefully, you are following the series? if not, you can catch up on the previous posts here. Having completed Stage 3 – Spatial Coordination, the procurement route now follows 1 of 2 routes: “Traditional Contract” – The design team willContinueContinue reading “Stage 4 – Technical Design, the final step before Construction”
You must be logged in to post a comment.