Cartersfield, Waltham Abbey

ADR Consulting Engineers were appointed to complete the design and build duties for the MEP services. Developing the current RIBA Stage 3 information to Stage 6 for construction record for both the mechanical, electrical and public health services. Providing a fully coordinated, ER compliant package for installation and record information. The design of the buildingsContinueContinue reading “Cartersfield, Waltham Abbey”

Mill View.

Small residential scheme for Ashford Borough Council consisting of four semi-detached houses. This site replaces houses destroyed by a gas explosion. These flats utilised the latest MEP technologies such as ASHP linked to underfloor heating systems and roof mounted PV arrays. Electric vehicle charging points were provided for each flat to allow residents to chargeContinueContinue reading “Mill View.”

Heathside.

Small residential scheme for Ashford Borough Council consisting of four properties arranged as ground and first floor flats. These flats utilised the latest MEP technologies such as ASHP linked to underfloor heating systems and roof mounted PV arrays. Electric vehicle charging points were provided for each flat to allow residents to charge vehicles further utilisingContinueContinue reading “Heathside.”

Oakleigh House.

ADR Consulting Engineers are excited to be starting a new housing project with Jenner Ltd for Ashford Borough Council. The project will consist of 54 independent living apartments for older residents alongside 5 apartments for adults with learning difficulties. Project Name Oakleigh House Project Value £TBC Project Stages TBC Design Software – CAD Team MembersContinueContinue reading “Oakleigh House.”

Whitfield Aspen School.

New two storey extensions for 8 classrooms and 4 group rooms. Heating and comfort cooling is supplied to spaces via natural ventilation and heat recovery (NVHR) units. Air source heat pumps from Kronoterm are used to generate heat during the colder months and changeover in order to supply cooling in summer. Project Name Whitfield AspenContinueContinue reading “Whitfield Aspen School.”

High-end residential, South of France.

ADR Consulting Engineers have been appointed by Knight Build to provide full Revit models and detailed installation drawings (RIBA Stage 5) for a high-end residential renovation in the South of France. Project Name Saint-Jean-Cap-Ferrat Project Value MEP value £250k Project Stages RIBA Stage 5 Project Highlights – Multiple consultant collaboration Design Software – Revit- CADContinueContinue reading “High-end residential, South of France.”

Lympne Castle

ADR Consulting Engineers were appointed to provide the replacement of the existing oil central boiler system with an air source heat pump system serving a mixture of new and existing radiators. New domestic services system and associated drainage. Project Name Lympne Castle Project Value £300-400k Project Stages RIBA Stage 5 Project Highlights – Multiple consultantContinueContinue reading “Lympne Castle”

The ADR team are proud to welcome Scott and Josh B.

We are very excited to officially welcome Scott and Josh B to the ADR team. Scott, Don, James and Lex have worked together in the past. Jasper and Josh have been collaborating at London South Bank University for a few years now.

Both Scott and Josh B. are driven, passionate engineers with an eye for detail and come from contracting backgrounds. We are thrilled to have them with us.

Exit mobile version