Park Royal 1

ADR Consulting Engineers were appointed to take the existing stage 3 MEP design and develop the stage 4-6 design stage information for the MEP contractors.

Project Name

Park Royal 1

Project Value

£10,000,00.00

Project Stages

Stages 4-6

Project Highlights

Utilising Revit and Trimble Connect to deliver accurate design information from digital to the built environment

Design Software

- Revit
- Trimble Connect
- Design Builder
- Electrical OM
- H2x
- DialuxEVO

Team Members

Don Foster
Nat Godden
Lex Rouzee
Jasper Simmonds
Jim Rose