ADR Consulting Engineers were appointed to take the existing stage 3 MEP design and develop the stage 4-6 design stage information for the MEP contractors.
Project Name
Park Royal 1
Project Value
£10,000,00.00
Project Stages
Stages 4-6
Project Highlights
Utilising Revit and Trimble Connect to deliver accurate design information from digital to the built environment
Design Software
- Revit
- Trimble Connect
- Design Builder
- Electrical OM
- H2x
- DialuxEVO
Team Members
Don Foster
Nat Godden
Lex Rouzee
Jasper Simmonds
Jim Rose